Search Email Updates Contact Us Residents Business Visitors Government Office of the Mayor NYC.gov always open
DOB Sign Up For Buildings News
Search Buildings
Translate the page
Get Adobe PDF Reader
 Adobe Acrobat Reader
(required to view PDFs)
Forms: OTCR

OTCR1 Alternative Material Acceptance Criteria Application
The OTCR1 is used to initiate review of existing standards and/or evaluation criteria for products categorized as alternative to the code. OTCR staff will manage the review process for adoption of DOB approved acceptance criteria.  Approved acceptance criteria are used by third party agencies for testing and/or certification (if required).
 Download Form (66 kb)
 Download Instructions (20 kb)

OTCR2 Site-Specific Approval Application
The OTCR2 is used to initiate the process of filing for a site specific approval. The Testing Laboratory of Professional Engineer performing the required test must also complete the OTCR3.
 Download Form (97 kb)
 Download Instructions (20 kb)

OTCR3 Testing Laboratory or Professional Engineer Statement
The OTCR3 is used by the Testing Laboratory or Professional Engineer to document required testing for the review of site specific approval.
 Download Form (75 kb)
 Download Instructions (19 kb)

BIS Web Query - Buildings Information System

BOROUGH
HOUSE #
STREET NAME:


Statistics

 BUILD Top 10
 Weekly Reports
 Monthly Reports
 Snapshot Reports
 OP-98 Rejections
NYC Penalty Relief Program
Right Now At Buildings
Practice Green

 Conserve Energy!
 Conserve Water!
 Energy Code
 Green Building
 Green Roof &
Solar Panel

 PlaNYC 2030
 
Copyright 2009 The City of New York Contact Us | FAQs | Privacy Statement | Site Map